Storage
Goods had to be stored in rigid plastic containers to try and prevent things from getting wet
Equipment Before
The customer was concerned about the toll water would take on his HVAC equipment
Drain System
We backfill the drain with stone before pouring fresh concrete to relevel the floor
Discharge
IceGuard® comes with a built-in overflow to prevent any backups due to freezing in the line
Beams
The wooden beams and joists were still in good shape, but a few more years of exposure to high humidity would take their toll and possibly cause bowing
Sump Pit
Our drain system feeds directly into the sump pit, where the pump pushes water through the discharge line
Encapsulation
Encapsulating the space seals out moisture and odour from the dirt floor
Vapour Barrier
CleanSpace® is strong, flexible, and brightens up the space
Equipment After
We encapsulated around the HVAC equipment to prevent water damage or rust
Electrical
We encapsulated around the panel as well to prevent a short caused by flooding or any damage to the board itself
Sump Pump
Our SuperSump® unit comes with an extra motor that turns on when the water level reaches the check valve