Beginning Project
The basement was cleared of belongings and the fiberglass pink insulation was removed from the walls.
Prep
Many objects and personal belongings needed to be moved before the project could start.
Obsticales
There were many obstacles in the basement.
Relocating Drains
The floor was excavated and the homeowners plumber upgraded and relocated the drains.
Drains Relocated
The drains needed to be relocated to be able to install the system and the heated floors.
Gravel Bed Installed
A gravel bed was installed. Insulation was installed on top of the gravel to prevent thermal losses into the ground from the heated floor.
WaterGuard Ports
WaterGuard port installed to allow for system inspections.
Perimeter of WaterGuard
WaterGuard was installed around the perimeter of the basement. Heated floor was installed over the gravel bed and insulation.
Sump Pumps Installed
SuperSump and Ultrasump installed prior to the floor being poured.
New Concrete floor
Concrete floor being poured.
Complete
Job complete, fully waterproofed basement with heated floors and ThermalDry Wall Membrane.
ThermalDry
Thermaldry wall membrane installed on all the walls to ensure no leakage.
Fully Waterproofed
Job completed.