Before
One of the many areas needing waterproofing.
Before
Outside wall before waterproofing.
Preperation
Getting all the products to use for the big project.
Start
Start of trench digging and ThermalDry installation.
WindowWell Ducts
Installation of Window Well Ducts
Installation of WaterGuard
Installation of WaterGuard
Ready for Concrete
Rocks were poured over the Watergaurd to prepare for the concrete.
FlowGuard
Installation of the FlowGuard over the WaterGuard.
Sump Pump Installation
Tight space for the sump pump to hide away.
Teamwork
This project was very large and went as smoothly as it did because of Teamwork.
Completed Concrete
Final step to do is pour the concrete.
Concrete Poured
Making sure the WaterGaurd port is usable, the concrete was poured.
Triple Safe Sump Pump
Completed the installation of the TripleSafe